Friday, December 7, 2012

If It Can, It Did

Today marked just another day in the life of CMR Phase II where something went wrong...  As Foreman Luke said today, "I think that the project is actually going along pretty smoothly!" To which Dan, our main construction man actually answered, "Yup, for a project where everything that could go wrong, did go wrong - - it's going along pretty smoothly!"  Truer words were never spoken...

As I mentioned yesterday, today the fridge and freezer were supposed to be delivered.   I got the call late yesterday afternoon from Miele concierge telling me that they would be here between 9 and 11.  We were thrilled.  We were excited.  We were wrong.  Wrong enough to want to go back to late October to really get a sense of where things really started to go wrong with the "Great Fridge Freezer Debacle of 2012."

It started November 20th just after the cabinets were delivered.   Foreman Luke called me in Phoenix to "quadruple check" that the fridge and freezer were Miele.  I thought the call kind of strange - - I mean I'd included them on the fixtures list, I had given the electrician and the plumer the spec for them - so I was fairly confident that he didn't need to "quadruple check."   But, I was cooking for 50 and didn't take too much time to dwell on it.  Come to find out that the reason he called was that the panels for the fridge and freezer had been scaled by our kitchen designer (or the manufacturer -- but who cares really?) to suit a different appliance  - - a sub-zero - - Big drag!

Henrybuilt stepped up immediately to quickly rectify the problem - - which included re-sizing and new construction of the cabinets above the fridge - - but the fastest that they could get those in to production and delivered to us would be around the 13th of December.  All good.  Way to go Henrybuilt.

So, 10 days ago I contact Miele concierge to try to get the delivery delayed until the 17th until the panels and cabinets could be delivered.  (Note: I had heard that the Miele warranty would be invalidated if they did not do the installation of the units AND the installation of the panels).  I said as much to Miele and the response I got was - - if I delayed the installation then, the next available date for delivery was early JANUARY - - to which I replied, "Um.....NO!"  I was then told that they would do the delivery on the 7th and it was O.K. that the panels were not here.  Ummmm, OK!

Today I was not at home during the delivery time.  I got the following sequence of phone calls:
  1. "This is Miele Concierge we'll be at your house in about 15 minutes."
  2.  "This is Miele Concierge" we are at your house, but no one here seems to know anything about a fridge delivery"  (They were at the wrong address - - and we are grateful that wrong house didn't realize their windfall and accept units and have them installed).
  3. "This is Luke.  Miele says that they cannot install the fridge or freezers without the panels as it will invalidate your warranty.  Can they just leave them here in the atrium until the panels are here?  They will come back on the 18th to install them."  (Huh?  What?  Did they say the 18th?  Of December?? The 18th??  Why didn't they say that date was available in the first place????  But, fine, whatever, yes, just put them on the porch)
  4. "This is Luke.  Can I verify the freezer that you ordered?  The one that they brought is too big for the space."  (Problem?  The wrong freezer was here.  Wrong as in about 22" too wide wrong.  This problem was not technically the fault of  Miele.  The problem originated at the place where we bought the appliances.  The place where we have never had an issue with before - - so I still love them even though I had a giant freezer I could use still on the truck and a fridge I couldn't install sitting in a box the size of King Tut's tomb on my porch.  Representative of the place filled out the order form incorrectly, then attached it to an email where in the body of the email that units were identified correctly - hence I did not open the attachment assuming that the order form would have the same information as the email -  hence I did not know that the wrong unit was ordered - hence I now only have a fridge on my porch as opposed to a fridge and a freezer - - hence they will need to bring the correct freezer on the 18th when they come to install them with the panels and my warranty will be effective).
Bottom line, I.  HAVE. NO. FRIDGE. OR. FREEZER. INSTALLED.  Crap.


And so for the second time in as many months I have a fridge on my porch.  Good news is that this on is not on the back porch, plugged in, holding my food.  Still...

In other news,  Howard the Electrician:

Here's Howard!!

managed to do lots of electrical finish work like put in all our ceiling lights (except for the pendants that will hang over the island where he is standing.  We ordered the lights a while ago and we loved the crystal protrusion as opposed to standard "cans" - - construction speak for canisters...  What we didn't realize but happily discovered was that our crystal protrusions would create a nice soft down light glow in the kitchen (an AMAZING thing considering we are forced by code to use LEDs which are known to be yukky and bright and horrid) but that they also created this amazing mid-century boomerang up light affect on the ceiling.  It's grand.

See the boomerang halos?  They look much better in person.  Hard to capture lights in a photo.
In the end, the bad is pairedwith some good.  We've got cooler lights than we ever imagined and we've got a fridge on our porch.  Cosmic balance.

On to next week.... I'm pretty much finished with this one.

Thursday, December 6, 2012

Whaaats Up???

I know, I know....loong time no update.  Things got a little hectic around the end of November.  Went to Phoenix to spend time with LOTS of family for a family reunion.  Spent a week cooking, catching up and generally having loads of fun.  It was so nice to see everyone, and especially for G and H to meet a lot of relatives that they have never met in person.  It was also kind of nice to get away from the day-to-day issues of Phase II I have to say.

But since it's been a while - - here is a very long post to catch every one up on the saga of CMR Phase II:  Kitchen-New....

On Friday the 16th - - this was the BIG news....

Big moving truck FULL of kitchen cabinets sent all the way from Seattle from Henrybuilt!

The stuff was extremely well packed and there was loads and loads of stuff

It was really great to see these cabinets. If you recall we had a CATASTROPHE regarding the ceiling height. Turns out it was a problem with the measurements and the folks that caused the problem stepped up immediately to rectify. Best of all, Henrybuilt came to the rescue, did us a real solid and got everything taken care of with only 1 week delay in shipping! Hazzah!!!

The cabinets came on a Friday and I hustled off to Phoenix the following Monday without a single view of the damn things getting unpacked.  I wish I had a photo of the garage, since all that was left was a wee narrow space for George the Elder to park his Ducati in.  My car was ousted long ago to make room for the stove, but at least you used to be able to walk through it to get to the lower level of the house.  Not so much once the cabinets were unloaded!

After I left - - George the Elder stayed behind a couple more days to work and to keep watch and to take some photos of cabinets starting to go in.  Since I wasn't around I have no idea of the sequence - - but you'll get the gist...
 
 
Here is the stove nook coming together.  Upper cabinets hung.  The grayish shiny stuff on the back wall is a protective sealant that is over our fancy schmancy stainless steel back splash that will cover the wall behind the stove!  They've peeled it back a bit below the upper cabinets - - you can see the black backing sort of hanging down.
 
This big boy actually belongs across the room as part of the "tall wall" - - it is 3 cabinets that sit at counter height and will house appliances, the microwave and, in the very top cabinet, lots of things I will never be able to reach :)
 
George the Elder, ever the critic, commented that they didn't make as much progress on day 1 as he had hoped.  Go figure.  But on to Day 2 of Cabinet installation...

Upper stove nook cabinets are partnered with their lower buddies.  These sit back a little from their big brothers and will eventually have glass fronted doors.  The uppers will be solid.

In goes the sink counter!  The dishwasher will eventually sit to the far left.  "Tall Wall" will be on the right.

This cool little thing is a nice shelf that will live right under the sink.  Talk about utilizing space that used to be wasted.  I can put dish soap and rubber gloves and all my little scrubby things in there so that my counter top remains free clutter.  Wheee!!

Back to the Stove nook.  This cabinet sits to the right of the stove and will eventually house a wire shelving type unit where we can put oils and what not with in easy reach of the cook top.

It's at this point in installation that George the Elder brought G3 and H to meet me in Phoenix. We returned to SF to see the kitchen-new in a whole new light.  These views will be preserved soley in our memory since I did not take any photos.  In fact, I got lazier than Ian McLazy of the McLazy clan and didn't take many photos for a while....I suck.

This week I finally got out the camera to capture the floor tile going in.  I also got out the camera today to take some photos of what things look like as I sit here typing....so here we go...

The stove nook with all the cabinets done and dusted!  Now all it waits for is the La Canche.  She's still downstairs in the garage nestled in her big crate biding her time until someone VERY strong comes to get her and put her in place.  The range hood right now is incorrect, but we are working on changing that.  It's supposed to be entirely flush with the middle cabinets -- but if that can't be fixed, we can live with it as is.  Cause, dang, doesn't it look great?  Dig the wood trim accent at the top.  It's the bomb.

Next up is the sink wall and part of the "tall wall".  Since the cabinets are all "under wraps" while the floor gets done and other big stuff goes on around it - - imagine that there are graphite colored cabinets all underneath there.  Remember the cabinet that was sitting on the floor the first day of cabinet installation?  Here it is right where it is supposed to be....
I have coveted large sinks ever since our time in Japan and Europe where the sinks are only large enough to wash your hands effectively.  This little puppy is HUGE and DEEP and Oh So Very Stainless.  I will NOT miss my pink sink -- nope, not for a single second.

Looking down in to the kitchen-new from the top of the short stairs, you can see that the island is in place and the pantry on the right is installed.  That pantry is Gee-Or-GEOUS and spacious and perfect.  Drawers and shelves inside are a organizational girl's dream!

Ohhhhh, the island.  We are loving the island!  9 drawers on the front, plus a sweet tall narrow cabinet for trays,  A bookshelf on the back to showcase some vintage kitchen items we've collected.  It's fabulous in its current state....But, wait -- there's more!  There's a piece that will sit on the edge of the island closest to us in this picture that makes my heart sing.   It's got drawers for knives, a hidey hole for our kitchen radio, and a junk drawer space to boot.  But it's sitting somewhere secret for now -- just waiting to make it's debut.  I have seen it up already-- but it had to come down while the electrical was sorted out and perhaps will wait for the stone to be put on before it comes out of hiding.  It's A-MAZZZ-ING.
A view standing at the back door.
A view looking in from the dining room.
And now for the tile.  I believe I might marry my tile.  We were looking for something that would give us the same feel as our polished concrete floors in the downstairs - - but that was durable, stain resistance and could clean up like a rugby player on prom night.  We found it....Thanks Ann Sacks!!

We used a big 12x12 square with very tight spacing.

It's all done and grouted already - - had a wee problem with there not being quite enough tile -- but Foreman Luke is on it and it should get here tomorrow.  I didn't get any photos of it when it was done - - and now it is already all covered up.  But, trust me when I tell you it looks soooooo perfect.

And with only a couple of weeks left before we are supposed to be "mostly finished" - - here's what's on the agenda...

Tomorrow:

See this big space?  See that little radio?  Tomorrow this whole space will be occupied by the new fridge and freezer that will be delivered.  30" of mind boggling refrigerator space!!  19" of crazy cold freezer space!!  We had a minor communication snafu with the fridge panels - - wrong dimensions for another product - - which then impacted the cabinets above the units -- but again, Henrybuilt acted quickly and the problem is being fixed and new panels and cabinets are rushing down here next week. 
George the Elder and I will head over to give our approval for our granite to be cut in to counter tops and island tops and sink wall back splashes.  I wish that this picture could really show the beauty in this hunk of stone.  It's a honed slab of granite -- so no shiny polished swirly stuff for us.  We are looking forward to seeing how this stone complements the graphite color and fir.  We're thinking it's going to be delicous.
There you have it - - a quick walk over three plus weeks of work on the kitchen-new.

I would be lying if I said that the time had gone so quickly that I didn't even notice it -- but then again, it hasn't exactly been dragging either.  We are more than pleased that our team is working so well together.  Problems arise every single day.  Little ones mostly - and some not so little ones - - but they are getting resolved in one way or another.  True that the "one way" generally involves us spending more money - - but that's the nature of the beast.

Luke still seems to think we'll be ready for Christmas.  I am cautiously optomistic.  Still so much to be done - - more drywalling, changing of the stove hood, installation of the roof blower for the range hood, construction on the roof, replacement of the gutters on the back of the house, more tiling, painting, more cabinets to come and get installed, dishwasher and stove to get installed, electrical and plumbing to finish... and the list goes on.  I just had a flash of Ty from "Extreme Makeovers" screaming in to his bull horn - - "LET'S GET WORKING PEOPLE!!!!!!"


Monday, November 12, 2012

Things they are a' changin

Things are a'changin here at CMR Phase II:  Kitchen-new.  I can thankfully report that our major dust storms are over!!  Demolition = CHECK.  Drywall = CHECK.  Most of the shrapnel vacuumed up = CHECK.  Subfloor poured = CHECK.  So now we wait for the good stuff and some of that is already happening!!
 
Primer completed and chicken wire awaits the concrete....
 
Underneath all this pretty "ply board" is our subfloor!!  It's level, I've got my 95" ceiling height and it's looking GOOD!

Sorry for the "over exposure" but in a sunny day it's virtually impossible to get a good quick photo in this direction.  It's a problem of too many windows.  A problem I am LOVING to live especially on those foggy SF days.  But here, both doors are open to the atrium so you can see what a large opening it is!

The while ply-board and the white walls make everything look a little larger than life, yes?  But soon, very soon, we're going to have loads of color in there.

So, that's the way things looked this morning at 8:30 when I took the last pictures and headed out to a meeting. It was all quiet on the front. No construction crew. Nothing. I returned from my meeting at exactly 10:00 and looky here!! A WINDOW!!! A Big Beautiful WINDOW!!! Gone is my boarded up hole in the wall. Amazing.

Isn't she a beaut???
This week is going to be a BIG one.  Cabinets are to be delivered and set, stainless steel back splash will be installed.  The sink (which I need to track down) will be set.  And then next week we're on to tiling the floor and cutting the stone for the counter tops.  Foreman Luke still promises that I will be cooking my Christmas dinner in the kitchen-new (of course for those of you in the know - - you understand that we make reservations for Christmas), but still, I will be cooking Christmas pancakes there and pouring loads of champagne.

George the Elder and I picked out some preliminary colors yesterday.  I think we're both happy where we're headed, but we still need to wait for the cabinets to get a final bead on what we want to do.  We really loved our "atmospheric" of kitchen-old - - and I think we've decided to go in a similar direction with kitchen-new assuming that the new-atmospheric substitute compliments the blue of the cabinets.  We won't know until they're in.  We're going to go with two colors in the kitchen (how bold are we?).   One on the stairway walls and another less bold color on the small areas near the cabinets.  Or at least that's the plan.  Who knows??  But, kudos to our guy at "house of color" for using his little color matching gizmo to get really excellent matches of the colors we were looking for.

So, onward to the really exciting parts.  The pretty parts.  The let's really see what kitchen-new is going to look like parts.  Fun, fun, fun!!

Wednesday, November 7, 2012

We Got Wall

Wiring takes time.  I found that out in week four.  Turns out that dry wall also takes time.  A whole week's worth of time - - and compact car sized dehumidifiers and big fans that make noise in the middle of the night and which make the plastic doors crinkle relentlessly All. Night. Long.  And then there's the dust.  Lots of dust.  Copious amounts of dust.  Haboob size clouds of white powdery dust. Insidious minuscule fragments of chalky hell that get on the bottom of every shoe in the house leaving ghostly footprints all over the place.

Much to my delight, on day three of dry walling they put up additional plastic over all the doors windows in kitchen-new.  This did help to control the Haboob slightly, but it effectively eliminated our "short-cut" through the kitchen.  Therefore, for the past week and a little we have been forced to go outside to get to whatever level of the house you are not in.  This was similar to week 1, so while we had had to do it before, it wasn't any more fun than it was before either.  Luckily, we've had some dandy weather, so there were only one or two wet nights when having to go outside fell in to the "this sucks" category.

I've been told that this is the worst week of remodeling when you are still living your house.  It's the middle of the project, the bloom is 100% off the rose called "exciting new project", you're tired of trying to be creative while making meals in a microwave, the non-stop pounding and hammering and sawing and sanding are on your very last frayed nerve. And now everything is covered in white dust.  Hip Hip Hurrah.  It's a damn dance party in week 6!!!



Ghostly looking railings being protected by plastic.

View from the top of the hallway stairs - - No more raw wood, just lots and lots of white walls.  Oh and many little blue plastic boxes that only hint at the snake's nest of wire behind the pretty white walls.

I think that the actual window will look much better than the large plywood they've got going here now. 

The ceiling required two solid days of work.  The dry wall went up after the ceiling was leveled .  Then the dry wall was partially taken down when foreman Luke and Dan felt it wasn't "level enough."  Since you can get a really good view of the kitchen ceiling from a horizontal view point from the top of the hallway stairs - it's critical that they get it "right" and as far as I can tell - - we now have the most level of all level ceilings!

The blending of the new drywall with the "old" walls that didn't really have to come down for the remodel. 

The stove nook looks more nook-y now that it's got a ceiling above it.   Lots of action behind that wall - electrical and gas and the vents from the very complex hot water radiant heating system - - 

Will get some photos of the remainder of week 6 tomorrow and Friday.  The walls are being primed, the mortar will get put down over the sub floor and the kitchen will be ready to receive all the pretty parts that come next.  Cabinets are on time for delivery next week and our new window is being delivered on Monday!  Week 7 is going to be VERY exciting!!

The last decision looming in the not too distant future is paint color.  This one may not be pretty as George the Elder and I are in two entirely different camps on this.  Oh, and those camps are located in two different states.  May the best man win (that'd be me) hahahah.

Belated Progress Report

Best laid plans and all that...  These photos have been sitting in my "draft" box for more than a week and every day I say, "I'm going to post them" and then things get in the way - - construction folks with questions, kids having to do things that require my attention or my car, oh and then there was (still is) this pesky problem with a little kidney stone.  Who knew a little 6mm piece of somethin-somethin could be so disruptive.  I told George the elder that the last time I felt pain like that they actually handed me a tiny human as a reward.  This time, I got nothin 'cept the promise of more pain to come.  Nice.

But, the show goes on here with the CMR Phase II.  These photos are from the week before last.  And things are a happening....



Sub floor is removed to access the radiant heat and to run new electrical what not to new places.  Much caution was used as poking a hole in one of those orange tubes is a "very bad thing" - - that's hot water running through them and they are what heat the house.


The rough opening for the new GIANT kitchen window is cut out.  That's one big damn hole!!  This photo shows that the old fridge was still waiting for it's new owner (one of our chinese plumbers) to come and get it.  A couple days after this was taken they arrived to get it.  It was in the evening during the final game of the world series, so I paid no attention as to how they got this bad boy out of the back yard. 

New canister lights (a SF code requirement) are lined up and the boxes installed.  Luckily Dan is very very tall.   He is handy to have around for ceiling work when you don't have a ladder!

Another view of the electrical stuff that will shortly be covered up by dry wall and disappeared.  It's really quick amazing how many wires it takes to power up a kitchen.

A view from the doorway to the atrium looking in at my window size from the inside.  It's gonna be a bee-you-T!!!

Onward to week 4.....

Sunday, October 21, 2012

What's in a ceiling??

It's been a looooong week.  So loooong that it actually moved in to the weekend - complete with CATASTROPHE in the middle of the day Saturday - - but we'll get to that in a minute...

First - - let me introduce you to foreman Luke.  I mention him many times, but now you can put a name to the face.  Luke was our finish foreman on Phase I of the CMR and I'm thrilled to have him heading up this job.  He's got a level head, is focused on getting the job done in time - - and more importantly, he's a calming influence when things go sideways.  And, things ALWAYS go sideways.   Sometimes they even go CATASTROPHICALLY sideways.

Smiling Foreman Luke....

But before CATASTROPHE - let's move on to progress... Beautiful piece of steel now holding up our ceiling and, thankfully, our roof.  All the temporary posts are down and the room is now entirely open.  We are just a little in love with this beam.



Once the beam went up and the walls came down, Dan took the day and taped off where our stuff was going to be.  This is done for a couple of reasons - - one to make sure it's gonna fit in according to the plans (which it does - - at least as far as fitting on the floor is concerned - - and THIS is a little foreshadowing for the CATASTROPHE...).   Second, it allows us to lay out the lights and make sure they're all in the right place.  See two pieces of blue tape in center island?  Those indicate the placement of our pendants...

Center Island in blue tape.

The whole right side of the "tall" cabinet wall and the sink counter layout.  Window is till the old window....waiting  anxiously for new window!!


Stove nook with new wall framed behind it and blue tape layout of bottom cabinets.  Window  gone bye-bye.

This is the last and final view from this angle - - open view from kitchen in to dining room.  As of today, that view is gone.  Sidewall that abuts the closet is now framed.  Dining room door is taped closed again.  The final "palette" for the kitchen is finished in that corner.



Lots of electrical/gas/plumbing work has been happening over the past few days, and I'll get in there with the camera later - but, we've got outlets, we've got switches, we've got gas lines and we've got water.  Lot's of gots!  But now you're kind of bored and you're wondering about the "CATASTROPHE" aren't you?  OK, I'll alleviate your curiosity...

Many months ago we started this project.  The kitchen was measured by our architects - - or at least the floor dimensions were.  The architect sent a CAD file to our cabinet designer in NYC.  She then proceeded to design a very cool and efficient kitchen in that space.  There were several back and forths about getting an inch here  - or getting a half and inch there (hence the space we took from the dining room and guest room closets).  We were looking for wee inches every where we could.   We must have measured that room corner to corner no less than 20 times.  We did it with a measuring tape, we did it with lasers, I even once measured the dining room closet space with my sewing yard stick.  It. Was. Measured.  We were CERTAIN.

And guess what?  When it was all laid out in blue tape - - it all fits.  It looks great.  Our many measurements worked perfectly.  Or did it?  Not so fast...

Yesterday we got a beautiful package of installation instructions from Henrybuilt on the many intricate steps that my construction guys were going to need to take to get my big old bad johnny cabinets installed the perfect way.  They came to me by email in a PDF file with a negative 2 font - - so Luke went to Kinkos and arrived here this morning with a BIG GIANT copy of the plans.  We looked at the plans - - everything fit.  That is until Luke takes his measuring tape and does something I never did in all the times that kitchen was measured.  He measured the height.  He checked the plans and measured the height again.  He checked the plans and used a laser to measure the height again.  Cause, guess what friends???  It's all kinds of wrong.  All kinds of 6" shorter wrong.

This wouldn't be a big CATASTROPHE if I didn't have floor to ceiling cabinets all along one wall.  Floor. To.  Ceiling.  Or technically now, I've got floor to roof cabinets sitting some where in Seattle biding their time to be trucked down here to SF.  This is NOT GOOD.

Foreman Luke, who I mentioned is great at keeping me calm when things go sideways -- has repeated "don't worry, we'll work it out" about a dozen times.  So, I haven't completely come unglued.  I don't know who measured the height.  Was it our architects who then passed that info on to our kitchen designer? Was it our kitchen designer who just plugged in a number?  I haven't got a clue.  I know it wasn't me  - since I never measured - - but I suspect that the buck stops here since I suspect I should have.

Wrote panicked email to Kitchen Designer in NYC.  Kitchen Designer says DON'T panic.  They can fix it.  I'm not exactly panicked, but I suspect my wallet will be when the "don't panic" becomes of-course-we-can-fix-it-for-the-low-low-cost of a boat load of money.

Let's see what tomorrow brings.....

Monday, October 15, 2012

Blue Steel

The last time we worked on the CMR, we were living elsewhere.  Come to find out that because we weren't around all the time, we probably missed some interesting conversations among and between the construction crew.  Now, due to the configuration of our house, and the fact that I am here during the day, I get to hear LOTS of interesting conversation.  I get to hear some things that are probably best left un-heard.

For instance, last week the crew spent some considerable amount of time talking about how to creatively solve construction challenges.  Challenges like how to best keep to roof from caving in until the time that the supporting steel beam could be installed.  This particular conversation was peppered with a number of "well, that MIGHT work"s.  "Might would work???"  whaaaaat?

I have to say that when it's your roof that they're talking about - - and more specifically, your roof that has the potential for caving in - - the word "might" is cause for some retrospection.  I mean, honestly, it's not much of a confidence builder.   "Might" indicates that their end solution just may end up a "might NOT."  And having my roof fall in is not something I would be particularly pleased with.  I mentioned this to Foreman Luke - you know something along the lines of it would be easier on my nervous system if the crew could, you know, lie or something.  You know - - speak with absolutely confidence.  Foreman Luke laughed.  That didn't help me much.  The good news is that the roof is still where the roof is supposed to be.

And now on to progress....Our beautiful new steel was delivered last Thursday...


Steel coming off truck...

Unknown strong steel guy  in red sweatshirt - the beam weighs more than 300 pounds.  He carried the front end like it was nothing.  The guy with the big smile is Ian - one of our crew.  He is one of the guys that is fond of the word "might" :)  The steel came in through the front door and through the inner atrium.  It was too long to make the turn into the back door in the kitchen to bring it in from the back yard.

Second strong unnamed steel guy and another one of our crew members sporting his Giant's gear!

Big bold steel beam now laying on the floor of the kitchen-new ready to be prepped to hold the roof up.  All the vertical posts that you can see are temporary.  These will come down as soon as the steel is installed.

And so, while the steel beam took up a few days residence on the kitchen-new floor - other things got taken care of.  The window was removed and the fill-in construction to the wall began.  Eventually, we will never be able to tell that a window was there at all...

The diagonal beam is also helping to support the ceiling/roof 

A big piece of the back exterior wall got taken down.  There was a chimney like structure here that housed a now-obsolete heating chase.  It became obsolete when we replaced the forced air heating system to radiant heat during Phase I.  We were THRILLED when we found out that this could do, cause now our new 88" window can be centered over the kitchen counter.  A historical rumor was also put to rest.  We had heard that the house had originally been painted gray.  And, indeed, once some of the original wood siding was uncovered, you can see where it really was gray.



This is kind of a hard photo to take....  So work with me here.  See the door waaaaay to the right of the photo...to the right of the blue electrical box?  That is the actual door from the kitchen to the dining room.  See what looks like a door to the right of the enormous yellow level?  That is actually not a door.  It is a new large square shaped hole on the wall that is technically the inside of a dining room closet.  We are "stealing" some of the space in that closet to give us some extra room for our sexy and wonderful 30" miele fridge in the kitchen-new.  Eventually, that will be closed off again and the closet door will be reinstalled in the dining room.  Part of that closet has always housed the back of the fridge from kitchen-old - - we're just commandeering another several inches more of it for the new fridge.  I think we'll probably end up with just a tall thin area in the closet for shelving. But, honestly, even if it's just a closet door leading to no where - - that fridge is going to be SO worth it....




As of Friday last, the steel beam remained on the kitchen floor - - un-installed - - but there was loads of banging and sawing and swearing today - - so I'll have new photos soon showing the result of all of that.  Some of this had to do with with installation of the beam  - - other parts I think had to do with the fact that we trapped a skunk in our backyard over night and the construction crew had to work in very close proximity of a potentially dangerously smelly attack.  I gotta hand it to em though - - they kept at it even while keeping a very close eye on Pepe Le Pew.

Week three begins!!!